Leadville Clarifier Replacement – Leadville, CO

  • Bringing the clarifier pieces in through the hole in the roof
Mueller Construction Services, Inc. replacing the entire clarifier assembly that includes, the existing clarifier rake assembly, skimmer and trough assembly, scum baffle and weir plate, influent well and center column, access bridge and railing, drive head, and light fixture. This project also includes installation of all electrical conduit and wiring and motor control center work. The existing fiberglass clarifier cover will remain in place during construction.
Once again Mueller Construction finds itself in a tight spot and ALL material and equipment will need to be brought in through either the 52″ diameter roof opening or two existing SINGLE doors.