Blue River Waste Water Treatment Plant – Silverthorne, CO

The Blue River Waste Water Treatment Plant Project consisted of modification inside existing waste water treatment plant, including install of 30” diameter ductile iron pipe, 16” diameter ductile iron pipe, 8” diameter ductile iron pipe, 12” and 6” pumps. The removal of an existing clarifier and the installation of a new one. All work performed with NO crane access.

Percent completed by MCS: 100%

Contract Dates: December 2014 – September 2015


Silverthorne-Dillon Joint Authority
Simon Stokes
26452 N. Hwy 9
Silverthorne, CO 80498