Eagle Springs Bridge – Wolcott, CO

The Eagle Springs Bridge project consisted of creating access to existing bridge pier piling. The bridge piling was severely corroded at both the high and low water surface elevations. Installed pile cap jackets spanning corroded area with a structural repair.

Percent completed by MCS: 70%

Contract Dates: September 1, 2014 – October 15, 2014